Consider safety through design, construction and daily use.
Our UK team undertakes both CDM Principal Designer and Building Regulations Principal Designer appointments. These are distinct roles: CDM 2015 in Great Britain focuses on managing foreseeable health and safety risks through design and planning; the Building Regulations role in England focuses on coordinating design work to meet the relevant building requirements. The responsibilities and scope are established for each appointment.
Alongside these appointments, we provide health and safety services for projects and premises already in use. These include fire risk assessments and certifications, COSHH and DSEAR assessments where workshops, chemicals or dangerous substances are involved, and project-specific risk assessments and reporting. We agree the scope around the location, its activities and the people who work in and visit it.
Design and construction coordination, reference photograph
CDM PRINCIPAL DESIGNER
Establish the CDM appointment
The client appoints a CDM Principal Designer where a project involves, or is likely to involve, more than one contractor. We establish the scope and arrangements early, helping the client understand their duties and allowing health and safety to inform design decisions from the outset.
Bring together pre-construction information
We help the client assemble relevant information about the site, existing buildings and known risks, including available surveys and health and safety files. We coordinate the information designers and contractors need to plan and carry out their work.
Address foreseeable design risks
We work with designers to eliminate foreseeable health and safety risks so far as reasonably practicable. Where risks cannot be eliminated, we coordinate how they are reduced or controlled and communicate the significant risks that remain, including those affecting future maintenance and alterations.
Coordinate the design team
We plan, manage and monitor pre-construction health and safety and coordinate cooperation between designers and the client. This includes design work and changes during construction where the appointment continues, keeping risk considerations connected to the developing design.
Liaise with the Principal Contractor
We exchange relevant design and risk information with the Principal Contractor to support construction planning and changes as work develops. The Principal Contractor remains responsible for managing construction-phase health and safety; the CDM Principal Designer coordinates the design-related responsibilities.
Prepare the health and safety file
We prepare, review and update the health and safety file as the project progresses, gathering information relevant to safe future work on the building. We arrange handover to the client, or to the Principal Contractor if our appointment ends before the project is complete.
BUILDING REGULATIONS PRINCIPAL DESIGNER
This appointment is separate from the CDM Principal Designer role. We establish the scope and responsibilities for the project under the applicable framework in England.
Plan, manage and monitor design compliance
For Building Regulations Principal Designer appointments in England, we plan, manage, monitor and coordinate the design work. We take reasonable steps to assess whether the design, if built, would comply with the relevant requirements and whether the designers are fulfilling their duties.
Coordinate designers and interfaces
We coordinate communication and cooperation between designers, the client and the Principal Contractor. Reviewing how the design packages fit together helps the team address compliance questions, manage design changes and share the information needed for the work.
Share information through delivery and handover
We liaise with the Principal Contractor about design and building work, consider compliance comments and assist the client with relevant information. Where an appointment ends or changes, we document the arrangements made and coordinate the required handover.
HEALTH & SAFETY ASSESSMENTS & REPORTING
Fire risk assessments
We assess fire risks in premises already in use, considering the activities, the people who may be affected and the arrangements in place. Findings and recommended actions help those responsible for the premises understand the issues that need attention.
Certifications and supporting records
Our post-construction services include certifications within the agreed scope. The type of certification and supporting records depends on the premises, the work undertaken and the applicable requirements. These are separate services from either Principal Designer appointment.
COSHH assessments
For workshops and projects involving hazardous substances, we assess how chemicals, dusts, fumes and other substances could affect health. We review the activities, possible exposure and existing controls, then report findings and recommended measures to prevent or adequately control exposure.
DSEAR assessments
Where dangerous substances could create fire, explosion or related safety risks, we assess the substances, processes and workplace arrangements under DSEAR. This includes relevant workshop and chemical activities, with findings and recommendations around controls, ignition sources and hazardous areas where applicable.
Project-specific risk assessments and reporting
We provide additional risk assessments and reporting for individual projects, activities or premises. The scope responds to the client’s question, the work taking place and the risks identified, with clear findings and recommended actions for the relevant teams.
Support for operating premises
We work with clients responsible for stores, showrooms, service centres and collision repair facilities. Share the location, how it operates and the support required so our UK team can agree the appropriate assessments and services.